The Storyboard

We did make a storyboard previous to this one but because of the problems I made another one with the correct setting. However, this was very difficult as I was away and unfortunately missed the filming at the time. I then contacted my other group members and they explained to me what the scenes were now and how they have changed so I was able to make a new storyboard with what the other members of the group had told me and showed them the image which they said matched the filming. 



Friday 17 December 2010

Us filming


filming the first corridor
 filming the second corridor

filming the door handle

our setting for our coursework

 the first corridor
 second corridor

 third corridor
 office side 1
office side 2

Entry one

We have finished designing our story board which will be uploaded soon as Hannah has finished doing the final drawing :D

We also started filming our coursework but didn't have time to finish and the office we tried to use was really small which meant it was hard trying to fit the camera, cast, and our group into the room.

The next day we continued filming but realized our clothes were different which would mean half way through our coursework the characters costumes would change and ruin our coursework and would have broken continuity as the movie would not flow, so we decided to re-do the filming completely so your movie had continuity. In addition this time we choose to use a different office which was a lot bigger and meant we could fit the cameras and cast in the room with no problem and make the 180 degree rule easier to follow.

Now all we have to do is edit our video and make it look good.